On January 2, 2025, an exciting news came from Ghana. The Ghana B5 PLUS project undertaken by Liaoye Group achieved major phased results – 2 sets of counting and steel-separating equipment were successfully installed and commissioned.
Under the close cooperation of the local technical team and professional engineers dispatched by Liaoye Group, many difficulties were overcome. From the fine assembly of equipment to the precise commissioning of complex parameters, every link was strictly controlled.
The successful commissioning of these 2 sets of counting and steel-separating equipment will greatly improve the production efficiency of the Ghana B5 PLUS project. Accurate counting and efficient steel-separating process are expected to help the local steel industry reach new heights. At the same time, it also demonstrates the excellent technical strength and strong overseas project execution capabilities of Liaoye Group, laying a solid foundation for the subsequent in-depth cooperation between the two parties.