- 45 tons of AOD is being built, it will take 2 days
- Some bricks need to be cut on site
- 45 tons AOD work site
45 tons of AOD smelting time is about 70 minutes and the service life is more than 100 furnaces


180 tons of AOD masonry site (9 air vents at the bottom, the most severely damaged part in the use environment

AOD Masonry Lift

AOD disassembly and masonry disassembly area after use
3 sets of 180 tons AOD, pouring molten steel from ladle to AOD
Temperature measurement and sampling
180-ton AOD service life 75-80 furnace